Retrofit Projects and Existing Conditions

Пошук
11 листоп. 2025, 15:5611.11.25
19.02.25
3

Retrofit Projects and Existing Conditions

On a seismic upgrade job, existing field conditions differ drastically from as-builts. The design team proposed several reinforcement methods that may not be feasible due to access constraints. We need a systematic constructability approach to verify all structural interventions before mobilization. What’s the best way to integrate constructability review into retrofit design updates? Schedule pressure is already high.

Перегляди
2
Коментарі
1
Коментарі
12 листоп. 2025, 21:3512.11.25
20.02.25
5

On seismic retrofit projects, I’ve found it effective to integrate a fields-builds.com approach by adding a constructability review at each design update. Verifying access, staging, and structural interventions early in the BIM model prevents on-site delays and helps prioritize feasible reinforcement methods under tight schedules. Regular checkpoints keep the team aligned and reduce rework.